Key Orders & Supply Performance

Innovation and Pioneering

2021 ~ present

  • 2024
    • Secured contract for the production, supply,
      and installation of the smart control signaling
      and communication system for Seoul Metro
    • Secured contract for the precision diagnosis and performance evaluation of signaling equipment between Iksan
      and Osu on the Jeolla Line
    • Secured contract for the production, supply,
      and installation of the comprehensive information
      platform display system for Line 2
    • Secured contract for ATP driving safety devices (2 units)
    • Secured contract for the production, supply,
      and installation of integrated SCUs at four stations including
      Yeonsinnae Station on Line 6
  • 2023
    • Secured contract for the CTC software modification service
      for the Samsung–Dongtan Metropolitan Express Railway
    • Secured contract for the CTC software modification service
      for the Daegu Metropolitan Railway project between Gumi
      and Gyeongsan and one additional project
    • Secured contract for the precision diagnosis and performance evaluation of signaling equipment on the Central Line
      between Paldang and Yongmun and one other section
    • Secured contract for ATP driving safety devices (8 units)
    • Secured contract for the station information processing device FEPOL
  • 2022
    • Secured contract for the maintenance service of CTC control equipment
      at the Railway Traffic Control Center
    • Secured contract for the production, supply, and installation
      of LDTS integrated SCUs for Line 6
    • Secured contract for spare parts supply,
      including 17 high-speed rail BTM items
      and 11 electric locomotive radar components
  • 2021
    • Secured contract for the purchase of the signaling system
      for the Ansan–Hyang double-track railway
      on Daegu Urban Railway Line 1
    • Secured contract for the production, supply, and installation
      of the signaling system (control center) for the Byeollae Line
      (extension of Line 8)
    • Developed and supplied the SRT Signaling Inspection System

Growth and Expansion

2016 ~ 2020

  • 2020
    • Secured contract for the purchase project
      of domestically produced on-board signaling devices
      (KTCS-2) for KTX
  • 2019
    • Supplied digital track circuit (KD2000) for Phase 1
      of the Gyeongbu High-Speed Railway
  • 2018
    • Supplied control and local equipment for the extension
      of Line 7 of Seoul Metro to Seongnam
    • Supplied CTC software for the Sillim Light Rail Transit
  • 2017
    • Supplied Local Data Transmission System (LDTS)
      for train control on Seoul Metro Line 5
    • Supplied CTC software for the Akhaural-Laksam section in Bangladesh
    • Supplied SEI board testing equipment
  • 2016
    • Supplied WCU Remote Recovery System for Failures
    • Developed signal security equipment for the extension construction
      for Phase 3 of Seoul Subway Line 9
    • Supplied CTC software for SRT in Thailand
    • Supplied track circuits for Phase 2
      of the Gyeongbu High-Speed Railway (Gunseo)
    • Supplied CTC S/W between Chinki and Chittagong in Bangladesh
    • Developed MCU system for ST5 electronic interlocking
      device in Thailand
    • Developed CBTC CTC and Local Console CTC software
      for Manila Line 3 in the Philippines
    • Supplied signal detection equipment
      for the comprehensive inspection vehicle (Roger-1000K)

Technological Advancement

2011 ~ 2015

  • 2015
    • Supplied train control systems for Metropolitan High-Speed Railway
      (LME, LCP, FEPOL, TIMS)
    • Developed ATC Remote Speed Control System
      for Metropolitan High-Speed Railway
    • Developed TTC System for Dadae Line Extension
      of Busan Subway Line 1
  • 2014
    • Supplied STC Maintenance and C-TCMS Control System
      for Phase 2 of Shinbundang Line
  • 2013
    • Developed monitoring software for signal equipment maintenance
      of Shinbundang Line
    • Developed compensation condenser testing device for KTX No. 36
    • Developed CTC software between Laksam and Chinki in Bangladesh
    • Developed ATP/ATO tester for Shinbundang Line
    • Developed and supplied Signal-IFC CDTS for Phases 2
      and 3 of Seoul Subway Line 9
    • Developed testing equipment for the vehicle
      base of Honam High-Speed Railway
  • 2012
    • Developed trackside signaling equipment
      for Rotem Changwon Testing Line
    • Developed and supplied train control systems
      for Honam High-Speed Railway
      (CC-RTU, TIMS, LCP)
  • 2011
    • Produced signal information relay devices for Busan Subway Line 2
    • Supplied IFC, CDTS for the extension of Daegu Subway Line 2

Foundation and Establishment

2001~2010

  • 2010
    • Developed streetcar track detection devices
      for Busan-Gimhae Light Rail Transit
    • Developed TCMS console for train control systems
      of Shinbundang Line
    • Developed signal equipment for the extension of Seoul Subway Line 7
  • 2009
    • Established the Incheon Monorail ATS system
    • Established the management information and inspection information systems
      for the Busan–Gimhae Light Rail Transit
    • Developed CBTC trackside equipment
    • Developed software for the high-speed rail
      electronic interlocking device (NSSI)
  • 2008
    • Developed on-board signal analyzer for high-speed rail ATC
    • Developed track monitoring and weather observation devices
      for Busan-Gimhae Light Rail Transit
    • Developed PSD signaling systems for Seoul Metro Line 6
  • 2007
    • Developed Gwangmyeong Station linked train
      operation monitoring device
    • Developed CDTS for Seoul Subway Line 9
    • Developed high-speed rail Phase 2 core equipment

      (FEPOL, LMP, LCP, CAMS)
    • Developed dual-redundant VDU in Taiwan (R-VPI Project)
    • Developed CBTC on-board device system
    • Developed autonomous distributed train conflict management module
  • 2006
    • Developed signal equipment for Phase 3,
      Section 1 of Busan Subway Line 2
    • Developed signaling training equipment for high-speed lines
    • Developed Gwangmyeong Station linked train signaling equipment
    • Developed ATC IXL field information simulator
      for high-speed rail signaling training equipment
    • Developed RRIC software for high-speed rail ATC remote initialization system
  • 2005
    • Developed CTC console for the central line,

      Korea Railroad Corporation (KORAIL)
    • Developed ATC continuous level measurement board
    • Developed board testers for ATC trackside devices
  • 2004
    • Developed LCP for Yeongdong maintenance base, high-speed rail
    • Developed Signal Equipment Intensive Monitoring System (SIMS)
      for high-speed rail
    • Conducted pilot project for Intelligent Train Control System (ITCS),
      interface design and development of on-board equipment
  • 2003
    • Designed Integrated Command Center System
    • Developed IFC, CDTS for Daegu Subway Line 2
    • Developed ESC for Hopo Vehicle Base, Busan Subway Line 2
  • 2002
    • Developed TPC for Busan Command Center, Korea National Railroad
    • Developed System Transfer Switch (SCO)
    • Developed VDU software for Taiwan MRT
    • Designed ST1 signaling system for the State Railway of Thailand
    • Produced LCC for Busanjin Station, Busan Subway Line 1
  • 2001
    • Developed LCP software for Gyeongbu High-Speed Rail
    • Developed CTC system software for Gyeongbu High-Speed Rail
    • Developed MPU for Daegu Subway Line 1
    • Developed vehicle type classifier for fare automatic collection system